NAVFAC Northwest closed $9 billion and opened a $15 billion ceiling on September 30
NAVFAC Northwest awarded its $9 billion VENTI MACC to 16 firms on September 30, then issued an unrestricted $15 billion MACC for the Puget Sound dry dock. Proposals are due December 1, and in-person conference registration closes October 12.
Market research, RFIs and industry days — where the set-aside decision is still open.
Every sources sought and RFI, 65 notices, grouped by response date
Open for offers now, soonest response date first.
Every solicitation, 94 notices, grouped by response date
Announced ahead of a solicitation. Time to build the team.
Every pre-solicitation notice, 38 notices, grouped by response date
Choose deadlines, then download just those as a calendar file (.ics)
Importing: in Google Calendar, Settings → Import & export → Import. In Outlook or Teams, open the file, or Add calendar → Upload from file. On a Mac or iPhone, open the file. Always confirm the time and any amendment on the notice itself.
Every lease action, 27, by what stage it is at
This newsletter, every weekday morning — only what is new to you
By 7 a.m. Eastern, Monday through Friday: every DoW, VA and GSA PBS construction and A/E notice posted in the last 24 hours, and every response date in the next seven days. Filtered to your agencies and regions, and never a notice you have already been sent. When a date moves or a notice is cancelled, you hear about it.
Founding-member rate through October 30: $39 a month or $390 a year, locked in for as long as you stay subscribed. Included in the annual subscription. The Monday newsletter stays free.
Start Base Bid Pro →NAVFAC Northwest closed $9 billion and opened a $15 billion ceiling on September 30
On September 30 NAVFAC Northwest posted the award of the VENTI multiple award construction contract: $9,000,000,000 across 16 indefinite-delivery, indefinite-quantity contracts. The term is not to exceed 96 months with an expected completion date of September 29, 2034. The scope is design-build or design-bid-build work on industrial, maintenance, warehouse, production, communications, personnel support, recreation, lodging, medical, training and aviation facilities, ranges and roads, special access program and sensitive compartmented information facilities, power and communication lines, substations, electrical upgrades and electrical distribution, highway, street and bridge construction, airfield pavement and culverts. The contracting office is CORE Planning Design and Acquisition at Silverdale, Washington.
An hour and twenty minutes later the same office posted the solicitation for the Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock multiple award construction contract. The notice states a base period of five years and one five-year option, a maximum possible duration of ten years, or an aggregate maximum estimated value of $15,000,000,000 for all task orders, whichever occurs first. Typical major construction task orders will range from $2,000,000,000 to $6,000,000,000, with smaller orders possible for early contractor involvement and alternative technical concepts. The work predominantly supports the Multi-Mission Dry Dock at Puget Sound Naval Shipyard and Intermediate Maintenance Facility at Naval Base Kitsap Bremerton, and other areas under the cognizance of NAVFAC Pacific. Primary NAICS is 237990, secondary 236220, and each holder receives a $1,000,000 minimum guarantee. It is unrestricted and open to full and open competition, and large businesses are advised that an acceptable small business subcontracting plan is required.
Two dates decide whether this is your week. The pre-proposal conference for the dry dock contract is October 15, 9:00 a.m. to noon Pacific, held both in person and online, with in-person registration capped at the first 150 registrants and closing October 12, and proposals are due December 1 at noon Pacific. The task order range is the filter to apply first: a program whose typical major order starts at $2,000,000,000 is a bonding and balance sheet question before it is a technical one, and the notice is explicit that every large business bidding must carry an acceptable small business subcontracting plan. For firms that will not prime it, the 16 VENTI holders are a primary subcontracting market at that office for the next eight years, and each holder’s contract number is published in the award notice.
Three dates on the dry dock contract
- 1 By Mon., Oct. 12 Register to attend in person
In-person seats at the pre-proposal conference are capped at the first 150 registrants, and in-person registration closes October 12.
- 2 Thu., Oct. 15 · 9:00 a.m. PT Attend the pre-proposal conference
Held 9:00 a.m. to noon Pacific, in person and online. Bring your bonding and subcontracting questions.
- 3 Tue., Dec. 1 · noon PT Submit, or be on someone's team
Typical major task orders run $2 billion to $6 billion, and every large business offeror needs an acceptable small business subcontracting plan.
USACE Honolulu's $300M small business MATOC runs out in 2028, and a $495M small business MATOC for Hawaii is already on the street
This vehicle has carried 26 task orders worth $194.5M, every one of them in Hawaii: a $24.2M pavement and electrical repair at Bradshaw Army Airfield on the Pohakuloa Training Area, a $16.8M Tinker Road bridge repair on Oahu, a $16.6M water tank repair at Schofield Barracks. It stops taking orders in March 2028 with about $105M of its ceiling unused. The same district is already competing a bigger one. On September 11 USACE Honolulu issued the solicitation for a $495M small business MATOC for design-build and design-bid-build construction in the State of Hawaii, after a presolicitation in August. It is a total small business set-aside under NAICS 236220, and proposals are due January 8, 2027 at 2:00 p.m. Hawaii time. The notice does not say whether it replaces this vehicle, but the buyer, the state and the set-aside match. A small business that wants Army construction work in Hawaii for the next several years has three months to build its proposal, and a firm that will not prime it should be settling its teaming now.
One of 235 construction and A/E vehicles that recompete in 2027 and 2028. The Vehicles & Teaming Index has every one: holders, orders, ceilings and end dates.
Vehicles & Teaming Index · $399 →SBA's 295,457-square-foot headquarters lease in Southwest D.C. enters its requirements window
At 24 months from expiration this lease is entering the window when GSA works with the tenant agency on its requirements, typically 18 to 24 months out. SBA decides whether it needs the same footprint, less space, a different layout or a different building. GSA's engagement with the lessor usually follows at about 18 months, which puts it near April 2027. The last time this requirement came up, GSA sent Congress a lease prospectus for about 264,807 rentable square feet. Nothing for the 2028 expiration is posted on SAM.gov yet. Every outcome is construction, and at this size a lot of it. If SBA stays, the owner reconfigures and builds out the space to keep it; if it moves, another building gets built out to receive it. On a succeeding lease the owner, not GSA, prices and buys that tenant improvement work, so the contractor who knows the owner before that conversation starts is the one in the room.
One of more than 2,000 GSA leases inside the 12 to 48 month window. The Lease Refresh Watchlist ranks every one by likely tenant improvement work, with lessor and tenant named.
Lease Refresh Watchlist · $449 →